Rakennustyöt käynnissä - valmistunee kolmen vuoden kuluttua:
Structural height 800 m (2,625 ft) (est.)
Height to tip 800 m (2,625 ft) (est.)
Height to roof 705+ m (2,313 ft) (estimate)
Height to top floor Unknown
Floors (Above ground) 167 [1]
Floors (Under ground) 2 [2]
Groundbreaking Sep. 21, 2004 [3]
Topout 2008 (est.)